PennDOT Potter and Cameron County Maintenance work schedule for the week of July 10 – July 14, 2023
The Pennsylvania Department of Transportation Potter and Cameron County Maintenance announces the following work schedule for the week of July 10 – July 14, 2023, weather permitting. Motorists should travel with extra caution in these and all work areas. Motorists should be aware that due to the nature of highway maintenance and emergency work, crews could be working on any highway at any time of the day or night.
Cameron County 0240
Box Culvert Replacement: Detour in place until July 13th
- State Route: 4001 (Old West Creek Road)
Bridge Deck Sealing
- State Route: 4002 (Beechwood Road)
Patching:
- State Route: 120 (Elk County line to the intersection of Moore Hill Road)
Potter County 0260
Sign Repairs/Replacement:
- State Route: Various SR throughout County
Seal Coat: Expect Delays
- State Route: 49 (Intersection of 44 – North Hollow Road)
- State Route: 4009 (Baker Creek Road)
- State Route: 4013 (North Hollow Road)
Side Dozing:
- State Route: 244 (Coneville to Genesee)
- State Route: 4023 (Eleven Mile Road)
Spray Patching:
- State Route: 1011 (Hickox/Ulysses Road)
Roadside Mowing:
- State Route: 4001 (Sartwell Creek Road)
- State Route: 6 (Roulette to Coudersport)
Ditching:
- State Route: 1005 (Phoenix Road)
The following work is scheduled to be completed by contractor, weather permitting:
Forest View Evergreen Tree Farms– Roadside Mowing
State Route: 449 (SR 6 intersection to SR 49 intersection)
State Route: 49 (SR 449 to North Hollow Road)
State Route: 4013 (North Hollow Road)
State Route: 1001 (Brooklyn Road)
Traffic control: Shadow Vehicle will be following the tractors as they mow along roadway.
Glenn O. Hawbaker Inc– Roadway Repair
State Route: 6 (Port Allegany to Coudersport) Contractors will continue with roadway repairs and drainage upgrades.
Traffic control: Traffic along SR 6 will be utilizing flaggers during work hours; multiple work zones may be in project area.
Nestlerode Contracting Company, Inc– Bridge Replacement
State Route: 1011 (Hickox/Ulysses Road)
Traffic control: Detour will be in place, traffic will use State Route 1012 (Jackson Road), State Route 49, and State Route 1011.
LTT Trucking LLC– Bridge Replacement
State Route: 449 (Brookland Road)
Traffic control: Detour will be in place, traffic will use State route 49, State route 1008 (Cross Road) and State route 1001 (Fox Hill Road)
IA Construction Corp– Roadway Repair
State Route: Contractors will be applying an overlay.
Traffic control: Traffic along SR 4013 (North Hollow Road) will be utilizing flaggers during normal work hours; multiple work zones may be in project area.
Dean Construction LLC– Bridge Replacement
State Route: 44 (Intersection of Tennessee Road)
Traffic control: Bridge will be closed, and the temporary roadway will carry traffic around the work zone.