PennDOT McKean County Maintenance Work Schedule for the Week of August 3

Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in McKean County the week of August 3rd. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in McKean County for the coming week is as follows:
Bridge Maintenance & Cleaning
- Route 346 at a bridge spanning an unnamed tributary of Foster Brook in Foster Township. Monday, August 3, through Friday, August 7. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
Pennsylvania has some of the oldest bridges in the country, with an average age of more than 50 years. Preventive maintenance is vital in extending the life of the structures. As such, PennDOT maintenance crews perform some bridge deck patching and structural repairs.
Patching
- All of Route 1007 (Bell Run Road) in Ceres Township. Monday, August 3, and Tuesday August 4. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
- All of Route 4001 (Big Shanty Road) in Lafayette Township. Wednesday, August 5, through Friday, August 7. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
Most permanent pothole patching is completed in spring or summer when temperatures stay consistently above freezing. Manual patching consists of filling potholes with warm mix asphalt using a shovel. It is then leveled and compacted. Mechanized patching consists of milling paving notches, cleaning the surface, applying tack to all edges to act as a glue. A paver then places warm mix into the milled paving notches, and a roller compacts the material. If patching was not performed, the damaged road surface would deteriorate further, and PennDOT would need to completely rebuild the road or perform more costly corrective measures.
Pipe Replacement & Cleaning
- Route 46 starting at Route 6 in Keating Township and continuing southbound approximately 15 miles. Monday, August 3, through Friday August 7. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
Pipe replacement and cleaning are essential in maintaining water flow around state roadways. Controlling water flow is one of the most important aspects of maintaining pavements. Uncontrolled water flow will damage both the pavement surface and the area under the pavement, which causes deterioration across the length of the pipe.
This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.
Customers can report road concerns by calling 1-800-FIX-ROAD. If you call after hours, please leave a name and phone number.
For more information on PennDOT’s maintenance activities, visit https://www.pa.gov/agencies/penndot/about-penndot/strategic-planning-and-operations/penndot-maintenance-activities





