PennDOT – District 3 News
Reconstruction Project Continues on Interstate 80 EB in Columbia County
Montoursville, PA – Motorists are advised that a multi-year reconstruction and resurfacing project continues on Interstate 80 eastbound in Columbia County, between mile markers 230 and 244 in Hemlock, Scott, and Mifflin Townships.
On Sunday, November 3, 2024, the contractor will perform roadway joint sawing and sealing between mile markers 230 and 234 in Hemlock and Scott townships. This work will occur between the hours of 7:00 PM and 6:00 AM, with an alternating lane restriction in place. This work is expected to be completed in one night.
On Monday November 4, 2024, the contractor will repair an area of roadway near eastbound mile marker 244 in Mifflin Township that was previously damaged by a crash. This work will occur between the hours of 7:00 PM and 6:00 AM, with an alternating lane restriction in place. This work is expected to be completed in one night.
Motorists should be alert, slow down, expect delays in travel, watch for stopped or slow-moving vehicle, watch for lane changes, and drive with caution through the work zone.
New Enterprise Stone and Lime Co., Inc. is the prime contractor for this $11.1 million reconstruction and resurfacing project. Work includes shoulder reconstruction, roadway resurfacing, structure preservation, signing, and other miscellaneous work. Work on this project is anticipated to be completed in 2025.